Our Projects

A showcase of our commitment to quality and excellence in the field.

Power Supply for National Center of Meteorology (NCM) – Phase 2

Power Supply for National Center of Meteorology (NCM) – Phase 2

Project Description

A critical infrastructure project to provide a robust and reliable power supply for the UAE's National Center of Meteorology & Seismology, ensuring uninterrupted operation of sensitive, mission-critical weather and seismic monitoring equipment.

Technologies Used

High-Voltage Cabling & TerminationsSubstation IntegrationOverhead Line (OHL) ConstructionSCADA System CompatibilityRedundant Power Systems

Goals

  • Ensure 100% uninterrupted power for sensitive meteorological equipment.
  • Meet and exceed stringent government infrastructure and safety standards.
  • Complete the project on schedule and within budget to support national security.

Challenges

  • Working within an operational, 24/7 critical facility without causing disruption.
  • Complex coordination with multiple government and private entities.
  • Adherence to the highest level of safety protocols for high-voltage work.

Key Players

Client

MINISTRY OF PRESIDENTIAL AFFAIR (MOPA)

NATIONAL CENTRE OF METEOROLOGY & SEISMOLOGY

Consultant

SNC Lavalin

Our Role

Specialized Electrical Contractor

OHL Modification & Dismantling for TRANSCO

OHL Modification & Dismantling for TRANSCO

Project Description

A large-scale project involving the modification of existing Overhead Lines (OHL) and the complex dismantling of several 220kV and 400kV lines to pave the way for new infrastructure development under contract N-18138/B.

Technologies Used

Heavy Machinery for DemolitionSpecialized De-stringing EquipmentControlled Tower Felling TechniquesScrap Material Processing & RecyclingAdvanced Project Phasing Logistics

Goals

  • Safely dismantle decommissioned power lines to clear corridors for new projects.
  • Adhere to strict TRANSCO and SNC Lavalin environmental and safety standards.
  • Execute complex, multi-stage dismantling without impacting adjacent live circuits.

Challenges

  • Managing the logistics of large-scale equipment and material removal.
  • Ensuring the safety of all personnel while working with massive structures.
  • Coordinating with the main contractor, Instalaciones Inabensa SA, for seamless execution.

Key Players

Client

TRANSCO

Projects Division, Abu Dhabi

Consultant

SNC Lavalin

Our Role

Approved Subcontractor for Dismantling Works

OPGW Rectification & Replacement Works

OPGW Rectification & Replacement Works

Project Description

A specialized project focused on rectifying and replacing faulty Optical Ground Wire (OPGW) spans at various locations for TRANSCO, a critical component for communication and grounding on high-voltage power lines (Contract N-17980).

Technologies Used

OPGW Stringing EquipmentFiber Optic Testing (OTDR)Live-Line Work MethodologiesTensioning and Sagging CalculationsJointing & Splicing of Fiber Optics

Goals

  • Restore communication and grounding integrity to the power line corridors.
  • Ensure long-term reliability and performance of the OPGW system.
  • Minimize downtime and impact on the grid during replacement activities.

Challenges

  • Precision work required at significant heights on transmission towers.
  • Diagnosing and pinpointing faults in long spans of fiber optic cable.
  • Working in close proximity to live high-voltage lines, requiring specialized safety protocols.

Key Players

Client

TRANSCO

Maintenance & Operations

Consultant

In-house/Main Contractor

Our Role

Approved OHL Sub-Contractor for OPGW Works